BIM features on the One Tower Bridge Project include:
- 3D Views, demotion phasing and construction sequencing used to express design intent.
- Over 700 piles parametrically modelled and subsequently scheduled with design loads, cut off levels and Coordinates.
- MEP/Struct 3D clash detection used to resolve conflicts within restricted access and confined areas.
- Modelling of existing Tower Bridge Reservoir from survey data allowed greater understanding of the basement intricacies and relationship to fragile Historical structures.